
End of ADSL 2026-2028: Saint-Paul, La Colle, Villeneuve-Loubet, Mougins
Overview: who gets cut off, and when
Important: these dates are definitive closures. There is no individual extension and no grace period — preparation happens before, not after.

Saint-Paul-de-Vence — cut off 27 January 2026
Practical consequence: if your Saint-Paul villa is still on ADSL, test fibre eligibility immediately, request the connection quote if civil works are needed, and if the lead time overshoots the cut-off date, plan for Starlink — as the definitive solution or as a bridge while the connection is built. Second homes, numerous in the commune, are the most exposed: nobody on site to notice the cut-off, alarm and cameras gone silent.
La Colle-sur-Loup — cut off 27 January 2026
For remote-working households, common in the commune, the stake is continuity: the fibre migration must be tested and validated before the end of January 2026, while ADSL is still active. For addresses without fibre on cut-off day, a Starlink installation can be planned within days and integrates with the existing network without changing the indoor WiFi — details on our Starlink installation page.
Villeneuve-Loubet — cut off 27 January 2026
In a co-owned building, fibre depends on the building being connected: if it isn't, the general-assembly vote and then the works can take over a year — a timetable incompatible with January 2026 if nothing is under way. Affected residents have two ways out: a 4G/5G box (decent mobile coverage on the coast, but variable speeds in season) or individual Starlink where the flat's exposure allows it. For businesses in the parks still on SDSL/ADSL, the switch to business fibre or Starlink with a backup link should be treated as a business-continuity project, not a mere subscription change.
Mougins — cut off 31 January 2028
Our recommendation for Mougins: connectivity audit during 2026-2027, fibre/Starlink decision made, migration completed by mid-2027 at the latest — a year's margin on the cut-off.
Cap-d'Ail, Théoule-sur-Mer and the rest of the department
For all other communes of the Alpes-Maritimes — Nice, Cannes, Antibes, Grasse, Vence and the hinterland — cut-offs will be staged between 2027 and 2030 in successive batches. Check your date on the official Orange map, then move on to choosing the solution: that's the purpose of our guide the end of ADSL: which internet solution to choose, comparing fibre, 4G/5G boxes and Starlink for your situation.
Your action plan by deadline
- 6 months before cut-off: test fibre eligibility for your exact address; in a co-owned building, check the building is connected; list everything depending on your line (alarm, remote monitoring, phone, TV).
- 3 months before: order the chosen solution. Fibre: installation and tests, keeping ADSL in parallel. No fibre possible: Starlink site survey and scheduled installation.
- 1 month before: switch sensitive services (landline number ported to VoIP, alarm tested on the new link), verify every critical usage.
- Cut-off day: nothing to do — the sign of a successful migration.
For residents of the five January 2026 communes, the deadline is immediate. Contact us for an express audit: real eligibility, a costed recommendation and an installation scheduled before the date.
FAQ: end of ADSL in these communes
What actually happens on cut-off day?
The copper line is deactivated at the exchange: the box loses sync, and internet, the analogue landline and ADSL TV stop for good. No intervention at your home is needed for the cut-off — and none can postpone it.
Are all operators affected, or only Orange?
All of them. Free, SFR and Bouygues lease the same copper network from Orange: on the commune's technical closure date, every ADSL/VDSL line stops, whatever the provider.
My second home is in an affected commune — what can I do remotely?
It's the riskiest case: a cut-off with no witness, alarm and cameras offline. We manage the migration remotely — eligibility study, fibre or Starlink installation, tests — with property access simply arranged in advance.
Can Starlink be installed before the cut-off without cutting my ADSL?
Yes, and that's the right method: both connections coexist, Starlink is validated in real conditions (speeds, video calls, cameras), then ADSL is cancelled — or you simply wait for the cut-off. Zero interruption.
What if fibre reaches my street after I've switched to Starlink?
Nothing is lost: the Starlink kit can be resold or reused as a backup link behind the fibre (dual WAN). For business use, that redundancy is actually the configuration we recommend.
Ready to transform your connectivity?
Free Quote